Q-2, r. 47.01 - Regulation respecting the traceability of excavated contaminated soils

Full text
10. The receiving site manager must also, to complete the registration,
(1)  indicate in the computer system if the activities at the site are exempted or not from the requirement to obtain an authorization under section 22 of the Act;
(2)  if covered by any of the following documents, provide the Minister with a copy of the document:
(a)  an authorization issued under section 22 of the Act permitting operation of the site or, if the site is not operated, permitting the manager to allow transported soils to be discharged at the site;
(b)  a declaration of compliance filed under section 31.0.6 of the Act for the discharge of contaminated soils at the receiving site; or
(c)  any rehabilitation plan approved by the Minister containing a measure concerning discharge of contaminated soils at the receiving site.
O.C. 877-2021, s. 10.
In force: 2021-11-01
10. The receiving site manager must also, to complete the registration,
(1)  indicate in the computer system if the activities at the site are exempted or not from the requirement to obtain an authorization under section 22 of the Act;
(2)  if covered by any of the following documents, provide the Minister with a copy of the document:
(a)  an authorization issued under section 22 of the Act permitting operation of the site or, if the site is not operated, permitting the manager to allow transported soils to be discharged at the site;
(b)  a declaration of compliance filed under section 31.0.6 of the Act for the discharge of contaminated soils at the receiving site; or
(c)  any rehabilitation plan approved by the Minister containing a measure concerning discharge of contaminated soils at the receiving site.
O.C. 877-2021, s. 10.